Minutes from the 2024 AGM have been prepared and await Board approval for accuracy. They should be posted on this page before the end of January 2025 on this page.
Thanks to everyone who attended either by phone or remote "zoom" link. We are one of the most sought-after condo developments in the west end of Toronto, and we need everyone's participation in keeping Silver Shadow Path a great place to live.
MINUTES OF THE 2023
ANNUAL GENERAL MEETING
OF UNIT OWNERS of York Condominium Corporation
No. 110, units 1-85 Silver Shadow Path
Held via video conference, Monday October 30th 7:00 p.m.
Representing the Board
Wendy Stewart President
Adam Capstick Vice President/Treasurer
Tim Sly Secretary
Howayda Tanious Director
AGM Guests & Officials
Brian Cerson Auditor, Brian T. Cerson, Chartered Professional Accountant
Diane Zerafa Condominium Manager, Goldview Property Management
Host/Moderator: Shimon Jonah (Goldview)
Preparation of Minutes: Tim Sly (#8)
Notice of Meeting, dated October 16, 2023, had been sent within the required 15 days to each registered Owner or Mortgagee, in accordance with the requirements of the Ontario Condominium Act, 1998 (the Act) and the By-Laws of the Corporation. Thirty-one Units were represented electronically and 1 proxy (37.6%), satisfying the AGM quorum requirement of 25% of Unit Owners represented in person or by proxy, in accordance with the Act.
-
Called to order: 7:07 pm
2. Review of Minutes from previous AGM (Oct 25, 2022)
Moved: to approve minutes: Snezana Tanic (#33). Seconded: Lucky Milidrag (#53).
(No objections) … … CARRIED.
3. Auditor’s Financial Report for year ending May 31st, 2023.
Brian Cerson advised that the audit report was “clean” meaning that owners could rely on the accuracy of the financial statements which fairly represented the financial activities of the Corporation for the year ended May 31, 2023. The auditor noted that showed net total assets of $423,942, essentially unchanged from year ending 2022.
Please refer to Auditor's Report (attached)
Questions raised from Auditor’s report:
Q: Lucky Milidrag (#53): Noted: Roof inspection & shingle replacement for the year about $21,000. Recalled 6-8 years ago all roofs were replaced in the complex. Asked can we compare yearly roof maintenance costs before and after the new roofs were installed?
Response [Brian Cerson]. Several bills were recorded for wind damage, and the record shows 100 bundles of shingles were purchased for $5,000 in advance of projected need, as this colour is no longer available. Advise referring to Manager (Diane) or the Board for detail re roofing costs in earlier years.
Q: Nancy Barnes (#24): Re: Insurance paid from yearly to every quarter; asked are we charged more for this type of billing?
Response: [Brian Cerson, Diane Zarafa]. No indication of extra interest being charged for this.
Q: Snezana Tanic (#33): Asked why water-main work for this year being charged to reserve fund for next year? Response: [Brian Cerson]: Three repairs (Dec/22, Mar/23, April/23) were charged to the reserve fund for the June 1st, 2022- May 31st, 2023, financial year. The charge for watermain replacement (July/23) will appear on the 2023-2024 financial year report.
Q: Danica Rajic (#30): Re: $800-900 in bank fees. Asked how can these be reduced?
Response: [Brian Cerson]:Bank is charging $60-70 per month service charges. That’s how banks operate. But the corporation also earned interest income during the year of $13,035.
Q: Aleks Milosevic (#71): Re: fence and gate repairs. Asked if they also being carried over to the next year? Also requested dollar amount for the two projects.
Response: [Brian Cerson]:Two bills relate to work in the 22-23 Fiscal year. (i) from Ontario roofing (6/2022) for $17,221; (ii) from Ontario Roofing (5/2023) for repairs to 15 units $25,255.
Q: Snezana Tanic (#33):Requested details of the concrete repair following the waterman work when it is completed.
Response: [Wendy Stewart]: Advised that we are still reviewing quotes for this work. It’s not appropriate to discuss at this stage of the meeting. We’ll try to get further information before the end of the AGM; if not, we’ll follow up afterwards.
Q: Nancy Barnes (#24): Re: Engineers’ estimated maintenance fees 3% then 4.9%. Asked: Has the Board considered increasing the fee in view of expenses this year and next?
Response: [Wendy Stewart]: The Board has considered this, hence the approval for upcoming year of 6.9% increase in the monthly fees.
Response:[Brian Cerson]: Added that engineer’s recommendation only relates to the reserve fund, not the monthly common element fees which include both reserve and operating.
Appointment of the Auditor for 2023-2024.
Adam Capstick (#5): Call for motion to “reappoint Brian Cerson as auditor for 2023-24 fiscal year”.
Moved: Tim Sly (#8). Seconded: Lucky Milidrag (#53). (No objections). Motion is CARRIED.
4. Board’s Report
Wendy Stwart (President) reported on the accomplishments and challenges during the year.
(Please see full report as attachment B)
5. Election to Board of Directors
Two positions are up for election (3 years each). Wendy Stewart (#48) read out the names of owners who are standing for (re)election: Adam Capstick (#5), Howayda Tannious (#7), Danica Rajic (#30).
The secretary of the Corporation has confirmed the eligibility of these persons to stand for election, and all three stated they were st7. ill willing to stand. No further nominations received after calling (three times) for nominations from the floor.
Moved: “close nominations”: (Tim Sly #8). Seconded Vesna Spasojevic (#57). No objections, CARRIED.
Candidates were asked to make a brief presentation to those attending in support of nomination:
-
Adam Capstick (#5): Has been serving on the Board for 12 years, lived in complex since 1981, and has no plans to live elsewhere. Has acted as Board Treasurer, with objective of maintaining a healthy reserve fund, and continuing our 50-year record of no special assessments. Thank you.
-
Howayda Tannious (#7): Has been serving since 2015/16 and has been pleased to offer technical perspective as a licenced architect. Will be pleased to continue working on the Board for the Community if elected. Thank you.
-
Danica Rajic (#30). Have been living here for more than 20 years. Background in electrical engineering, and good in math. Has family (3 kids) so I have a good idea what the needs are in the neighbourhood. Thank you.
Shimon Jonah (host): commenced the election procedure.
6. Discussion/Questions from the floor
Wendy Stewart (#48): Gave an update re repaving following watermain work: Explained reasons for delay in asphalt repair and decision to replace sidewalk first.
Q: Nancy Barnes (#24): Could Everall use a couple of visitor spaces for piling snow instead of blocking and restricting sightlines at the exits?
Response: Diane Zerafa (Manager, Goldview): Agreed. This was also an issue last year and will meet with contractor to underscore need to prevent inappropriate snow piling.
Q: Aleks Milosevic (#71): Had cable box damaged last year by piled snow. Also requested greater attention to damaged road surface (SE corner) through the winter as further deterioration is expected.
Response: Diane Zerafa (Manager, Goldview): Is aware of this, and will remind the plow operators to try to compact the surface and not disturb the added gravel. Is meeting on-site next week with contractor.
Q: Danica Rajic (#30): Re: noise from leaf blowers by landscapers. Can noise be reduced?
Response: Wendy Stewart (#48): until his retirement, all work was done by Tony, who worked alone. Doubted that we can return to hand-raking now. But agree the noise is excessive.
Q: Danica Rajic (#30): Was previously connected to Bell, currently connected to Rogers. Bell fibre was cut during repair work. Can this be repaired in case Bell chosen again? When would be the best time?
Response: Diane Zerafa (Manager, Goldview): Yes, can request Bell to repair anytime. Best while surface work is still unfinished.
Q: Danica Rajic (#30): Neighbour has racoon in attic. Asking about pest control
Response: Diane Zerafa (Manager, Goldview): Triple-A Wildlife Ltd. attended two units. Raccoons gained access by pulling off a roof vent. Trapdoors have been installed to allow raccoons to exit but not re-enter. Technician to return next week to install new roof vents with wire mesh.
Q: Danica Rajic (#30): Asked if Management and Board could be more transparent about plans and works to be done, and to communicate to owners/occupiers, for example the road repairs.
Response: Wendy Stewart (#48): We will endeavour to be more transparent in communication, via the website and other channels.
Response : Tim Sly (#8): Reminded re summaries of Board meetings procedures are posted on the website (with exclusion of individual identifiers, names, etc.).
Q: Kathy Tricario (#65): Comments Re: Dead tree branches directly outside likely to fall. Is this included in the planned tree work?
Response: Diane Zerafa (Manager, Goldview): Recall that some branches were trimmed. We need to look again in the spring and to make a decision as to replacement.
Q: Kathy Tricario (#65): Re: raccoons under deck at #65. Included in the other pest control work?
Response: Diane Zerafa (Manager, Goldview): Under the deck is responsibility of the owner (defined as “exclusive use”), as opposed to roof which is “common element”.
Q: Nancy Barnes (#24): Re rain drain adjacent to #85 across from the house, was covered with a mesh during repair work. It is now blocked with leaves.
Response: Wendy Stewart (#48): Noted.
Q: Nancy Barnes (#24): Asked if others have had connectivity problems with Rogers?
Response: Diane Zerafa (Manager, Goldview): Please send description of problem and will ask Rogers to get in touch directly.
Response: Vesna Spasojevic (#57): Reported similar problems
Response Wendy Stewart (#48): Please look at website and find the telephone number for calling Rogers. Remember to mention this is a “BULK” contract. Also let Diane know.
Q: Tim Sly (#8): Point of order re “proxy” forms in package. They can legally only be used when printed one-sided due to provisions for removing identifiers when submitted.
Q: Taryn George (#62): Asked about decorative flags; we are still flying the spring flag. Should we stop using them?
Response: Diane Zerafa (Manager, Goldview): Saw the mistake and will change to the correct seasonal flag
Q: Snezana Tanic (#33): Re Iron balcony railings. Are they due for replacement next year?
Response Wendy Stewart (#48): Recalls that they were deferred for repair or replacement until next year.
Response: Diane Zerafa (Manager, Goldview): We can get a few proposals early in the year for either repair or replacement with new materials.
Q: Veera Karbhari (#28): Re: Lighting throughout the complex; perhaps drop flags for better lighting?
Response Wendy Stewart (#48): Lighting continues to be an issue due in part to the existing wiring. The flags only cost us about a couple of hundred dollars a year and we feel it adds a nice touch.
Q: Veera Karbhari (#28): Asks are visitor parking roadways to be repaired?
Response Wendy Stewart (#48): The current work entails only the sidewalk concrete. The asphalt repair in Spring 2024, will not include visitor areas, but they should be included following the final watermain work.
Q: Nancy Barnes (#24): Asked if we are considering installing glass-panel railings in the future for a more modern appearance.
Response: Diane Zerafa (Manager, Goldview): Will arrange some quotes as to cost of this
7. Announcement of new board members (Results of election)
(No proxy votes had been received)
Shimon Jonah (Goldview): Adam Capstick and Howayda Tannious were re-elected to the Board.
Moved: Tim Sly (#8) “In accordance with the Ontario Condominium Act,
to retain ballots & proxies for 90 days after which ballots & proxies may be destroyed”.
Seconded: Snezana Tanic (#33) No objections … CARRIED.
8. Adjournment
Moved: Tim Sly (#8): “Adjournment of the meeting”. Seconded: Snezana Tanic (#33)
No objections … CARRIED
YYC110 AGM adjourned at 9:16 pm
ATTACHMENTS TO THE MINUTES
ATTACHMENT A:
Summary of Financial Report by Brian Cerson, CPA.(Year end May 31, 2023)
Based on an annual reserve fund contribution of $159,735 to the reserve fund for 2022, the report recommends annual reserve fund contribution increases of 2.5% for 2023, 4.9% per year for each year from 2024 to 2026, followed by 3% increases for each year from 2027 until 2051, with all interest earned to be reinvested to maintain a positive fund balance over the next 30 years.The current year reserve fund contribution was $163,729, which is consistent with the Report’s recommendations and the Board’s funding plan.The current year reserve fund expenditures were $180,680, which is considerably higher than the $121,540 expenditures that were anticipated in the Report for this year. The main reason for this was because the corporation incurred $57,342 of costs as a result of 3 water main breaks that needed to be repaired during 2023, with no costs of this nature being anticipated in the report for 2023.
The report had projected a reserve fund balance at May 31st 2023 of $680,308 whereas the actual balance in the reserve fund on that date was $458,887, indicating a potential shortfall of $221,421.This difference has partially arisen from the current year’s expenditure variance discussed above, and partially arisen as a result of the 2022 actual expenditures incurred of $160, 680 coming in much higher than the very low amount of #4,238 that was projected for 2022 when the Report was prepared.
ATTACHMENT B: BOARD REPORT BY WENDY STEWART, PRESIDENT OF THE BOARD
President’s Report
Thank you for attending the AGM. We are now in our fourth year of “ZOOM AGM” and we are pleased to welcome owners attending welcome.
It is my pleasure to be able to share a recap of the YCC 110 story for the past year, and to highlight some of the projects we accomplished.
This AGM covers Because we have a mid-year fiscal year, it is sometimes hard to remember to talk about the – but we are going to try.
You have already had a great review of the financial picture from our auditor, Brian Cerson. Thank you again Brian, for continuing to provide great guidance, timely financials, and always for refreshing our collective knowledge of balance sheets and income statements!
As a Board, we have several goals:
-
To balance the need for repair and maintenance around the complex
-
To use the operating budget (the expenses that we project such as hydro, landscaping and snow removal, water expense, property management fees, etc.) wisely
-
Fulfill the requirement to build our Reserve Fund, so that we can maintain (and elevate) property value and ensure a safe and secure community
-
A word about the Reserve Fund and our monthly maintenance fees:
Even before the current inflation spike, the Auditor General of Ontario reported that 69 percent of surveyed condo boards did NOT have adequate funds to pay for major repairs. Many condominium boards have been basing fee increases upon the Consumer Price Index (around 2 percent) - clearly unrealistic! As a result, some high-rise condominium communities are now facing monthly fee increases up to 30-50 percent to avoid charging owners with "special assessments".
-
At Silver Shadow Path, we have consistently followed the Reserve Fund Study Contribution Guide in preparing the annual budget for the operating costs and reserve fund contributions. This year, we approved a 6.9% increase for monthly maintenance fees, which we believe will keep the fund healthy, with enough of an allowance to deal with increased costs of repair and other related expenses due to the age of the complex, inflation, and more.
Real Estate Update / Unit Sales June 2022 – May 2023
We have had several sales in the past year, and property values remain high. We welcome any new owners to the AGM. Would you raise a hand to let us know who you are, and the unit you own?
Thanks to Mark Howarth – an owner at SSP, former Board member, and real estate broker (Royal Lepage Terrequity Realty) who provided some data about the three recorded sales from June 1, 2022, to May 31st, 2023:
-
#33 - Sold for $740,000 on July 9th, 2022.
-
#13 - Sold for $713,000 on Feb 6th, 2023.
-
#23 - Sold for $1,040,000 on April 24, 2023.
This gives an average sale price of $813,000.
Mark indicated that the market is generally slow right now, given the high interest rates for mortgages, and inventory accumulating.
FY 2022-2023 Projects
These were the main projects initiated and/or completed by our contractors during the summer and fall of 2022 and the winter and spring of 2023.
Landscaping and winter preparation – from our supplier Everall Property Management.
-
Cutting the lawns, leaf pickup is underway, winter readiness is next on the list.
-
We continued the work on preserving the trees in the complex through Davey Tree – the large ash trees were injected against the ash borer infestation, maintaining the canopy, trimming for safety where needed.
Several trees have been replaced, and we count on owners to water these trees – essential for newly planted trees.
Communication and other projects
-
Spring and winter newsletters sent out to owners (by Goldview)
-
Standard Unit Bylaw (SUB) was passed by our owners and is now a part of our documentation.
-
Visitor parking continues to be monitored by EZPermit; and the number of available visitor spaces at any given time is much improved. EZPermit parking is required if you have visitors parked between midnight and 7:00 a.m.
-
For new owners – please remember to register with EZPermit for parking after midnight. If you need assistance, please contact the management office (Diane Zerafa or Raj Chatha) to review the procedures and get the information you need.
-
We continue to ask you and your guests to follow the rules. It is really this simple:
- Slow down – and make it a safe space for all who use it!
- Guests please park in the visitor’s parking lot; owners, please park in their driveways.
- NO ONE parks on the road!! Emergency vehicles must have clear access.
- And remember – it’s one way driving around the complex. You may need to remind visitors and ask those going the wrong way to turn around.
Access Gate Permanently Opened
The gate to the church parking lot has been permanently removed; lighting has been improved and the path continues to be monitored for defects.
Emergency repairs
We deal with leaks, roof issues, fence breakages, tree pruning, nest removals, potholes, dips in the sidewalk, to name a few. Please contact Diane Zerafa if you have something that needs attention. Email is the best option.
Water, water, and more water
We started having water main issues (breakages, leaks) many years ago.
In 2009, there were two breaks. 2011 we had a break in front of #84.
In 2015 there were two breaks, which occurred at units #48-52 and at #85.
Extensive repairs and new watermains were required in 2016 for the breaks that occurred in the area from the vault (where the city water enters SSP – by units 13, east to the corner, then south to unit 85; and the repair from units 48 – 56.
Then we had a quiet period… so we planned to complete watermain replacement proactively, as it was clear the mains were deteriorating.To that end we asked the Engineering firm that conducts the reserve fund study to move the watermain repair schedule up (originally it was projected for 2036).
Not watermain related, but in some ways perhaps it is! With – we had to rebuild 2 of the 6 electrical vaults on the property (meaning we paid in excess of $100K to have this very technical work done).
And then, 2022 came along, giving us three breaks in the watermain, in three different areas. We made the decision to replace the watermain from unit 48 to 26 (south side of the complex); and schedule the remaining work (from unit 56 to unit 12) for 2024.
The actual work didn’t get underway until July of 2023, so technically this is a project to report on at the next AGM… but I will say that it is completed.The last step – replacing the sidewalk is underway.For those interested, in other areas of the complex, the water main runs underneath the roadway, so replacement work was more straightforward, involving only the roadway.For this section just completed, much of the watermain was found , which required the removal of the sidewalk… and subsequent replacement. The roadway, and the costs to replace the pavement have tripled in price. The contractor recommends preparing the surface paving next spring.
A note about ice melter for the upcoming winter season:
We have, historically, distributed ice melter to be used for the stairs and landings.Ice melter is a better option to prevent damage to the stairs and pads caused by rock salt.The ice melter has become very expensive and our budget is strained as a result.Effective this year, the Board has decided to , and ask owners to buy their own jugs, for use on their stairs and landings. We do have a quantity of ice melter left from last year that can be distributed to owners – while quantities last. Please send a note to Diane to request a jug.
We will meet with Everall again this fall to encourage them to use less salt on the stairs and focus on the salt distribution on driveways and sidewalks. This is a safety/liability issue for Everall so we cannot eliminate it altogether, but if you are using ice melter on your stairs, it will be evident, and they will be careful about re-salting stairways and landings.
Silver Shadow Path Website – have you checked it out lately?
Created, designed, maintained by Board member Tim Sly, it is a great resource and handy spot to find contact numbers and information. If you have a couple of spare hours… and a love of all things digital, Tim could use a hand! Please contact him to volunteer your services!
Finally – a big thank you to who have continued to provide coverage for us during the year. We are thankful to have you and the Goldview team working for us!
2022 ANNUAL
GENERAL MEETING
OF THE UNIT OWNERS of York Condominium Corporation
No. 110, units 1-85 Silver Shadow Path
held on Tuesday, October 25, 2022 at 7:00 p.m.
via video conference.
Representing the Board
Wendy Stewart President
Adam Capstick Vice President/Treasurer
Tim Sly Secretary
Howayda Tanious Director
AGM Guests & Officials
Brian Cerson Auditor, Brian T. Cerson, Chartered Professional Accountant
Diane Zerafa Condominium Manager, Goldview Property Management
Rebecca Pedoe Executive Administrator, Goldview Property Management
Angela Ziarnik Recording Secretary, INaMINUTE Ltd.
1.0 CALL TO ORDER / INTRODUCTIONS
Rebecca Pedoe, of Goldview Property Management, introduced herself and advised Owners how to vote, make or second motions and ask questions.
Wendy Stewart presided as Chair and welcomed the Owners to the Annual General Meeting (AGM) of York Condominium Corporation No. 110. The Chair introduced the Board of Directors, Property Management, the Auditor, and the Recording Secretary and called the meeting to order at 7:10 p.m.
2.0 NOTICE OF MEETING AND CONFIRMATION OF QUORUM
The Chair confirmed that the Notice of Meeting, dated October 7, 2022, had been sent within the required 15 days to each registered Owner or Mortgagee, in accordance with the requirements of the Condominium Act, 1998 (the Act) and the By-Laws of the Corporation and advised that the Proof of Notice was on hand should anyone wish to view it.
There were 31 Units represented electronically and by proxy, which satisfied the AGM quorum requirement of 25% of the Unit Owners represented in person or by proxy, in accordance with the Act. With a quorum present and proper notice having been given, the Chair stated that the Annual General Meeting was duly constituted to conduct business.
3.0 APPROVAL OF MINUTES OF THE ANNUAL GENERAL MEETING MINUTES –
OCTOBER 26, 2021
The Chair stated that the minutes of the Annual General Meeting held on October 26, 2021, had been duly sent with the Notice to all Owners/Mortgagees of the Corporation and asked for errors and omissions to be brought forth from the floor. There being no corrections the Chair asked for a motion to adopt the minutes to record as presented.
On a MOTION by Dragan Spasojevic (Unit 16), seconded by Emilie Lamy (Unit 9), it was resolved to dispense with the reading of the minutes of the Annual General Meeting held on October 26, 2021, and to adopt the minutes to record, as presented.
The motion was carried.
4.0 AUDITOR’S REPORT
4.1 Presentation of Audited Financial Statements for the Period Ended May 31, 2022
The Chair announced that copies of the Auditor’s Report and the Audited Financial Statements had been sent to all Owners with the Notice of Meeting. The Chair asked Auditor Brian Cerson to review the Audited Financial Statements for the period ending May 31, 2022.
The Auditor advised that the audit report was clean, meaning Owners could rely on the accuracy of the financial statements as they fairly represented the financial activities of the Corporation for the year ended May 31, 2022.
The Auditor referred Owners to the Balance Sheet, noting assets in cash, investments, common element fees receivable and prepaid expenses, for a total of $510,483. After liabilities of $86,238 net assets totaled $424,245.
The Statement of General Operations showed revenues of $509,500, of which approximately one (1) third was allocated to the Reserve Fund. Operating Expenses totaled $375,158, resulting in a deficit of $22,495 for the year. When added to the deficit balance at the start of the year, the Operating Fund balance had a deficit of $38,558 as of May 31, 2022.
The Reserve Fund balance, after allocations of $159,735 and expenditures of $160,678, was $462,803 as of May 31, 2022. The most recent Reserve Fund Study had been prepared by Cion / Coulter Engineers & Building Sciences, dated March 22, 2020.
The Chair opened the floor to questions and thanked the Auditor for his presentation.
Vesna Spasojevic (Unit 57) commented that it was her understanding that salt and snow removal were all included in the contract and even if additional salting was required that would not increase the cost of the contract and requested that the Board review new vendors in anticipation of obtaining a lower price for next year’s contract.
The Auditor advised that there was a variety of contracts that a corporation could enter into which depended on the needs of a property and the Board had chosen the contract that fit best.
Alexander Rajic (Unit 30) commented that $60,000 spent on the caulking project seemed high and requested that further details of the project including which units were addressed be provided to Owners.
The Auditor reported that Management had an itemized list of the total number of windows, doors and other areas addressed.
Bryan Alas (Unit 69) inquired what the process was when the Board chose a vendor.
Management advised that Management obtains three (3) or more quotes, at times an engineer could be engaged for more complex projects and then all the information was presented to the Board.
5.0 APPOINTMENT OF AUDITORS
Adam called for a motion to reappoint the Auditor for the fiscal year ending May 31, 2023.
On a MOTION by Rhonda Tsingos (Unit 74), seconded by Alan Conquergood (Unit 55), it was resolved that in accordance with Section 62(b) of the Condominium Act, 1998, the firm of Brian T. Cerson, Chartered Professional Accountant be appointed Auditor of the Corporation, to hold office until the close of the next Annual General Meeting of the Owners, or until their successors are appointed at a remuneration to be fixed by the Board and that the Board is hereby authorized to fix such remuneration at a duly called meeting of the Board.
The motion was carried.
6.0 BOARD’S REPORT
Wendy Stewart presented the President’s Report, providing an overview of accomplishments and challenges during the June 1, 2021, through May 31, 2022, fiscal year. The President’s report is appended to these minutes.
7.0 NOMINATION / ELECTION OF ONE (1) DIRECTOR
7.1 Nomination of Candidates
The Chair informed attendees that, prior to delivery of the Notice of Meeting, no candidates had informed the Corporation of their intent to stand for election.
The Chair proceeded to call for nominations from the floor three (3) times and received the following nomination.
-
Lucky Milidrag (Unit 53) nominated Vesna Spasojevic (Unit 57)
Following the nomination, and with no further nominations, the Chair asked for a motion to close the nominations.
On a MOTION by Lara Maalouf (Unit 58), seconded by Sheila Holmes (Unit 44), it was resolved that the nominations from the floor be closed.
The motion was carried.
7.2 Election Results
The Chair invited the candidate to make a brief presentation.
The Chair stated that:
Vesna Spasojevic (Unit 57) was duly elected, by acclamation, as Director of the Corporation.
8.0 OTHER BUSINESS
The Chair opened the floor for questions.
Vesna Spasojevic (Unit 57) commented that by locking the access gate that there was no walkway, and the fence was being damaged by residents jumping over to access the other side.
Timothy Sly (Unit 8) requested that Vesna Spasojevic to go to www.silvershadowpath.com and provide Tim Sly with her email so her comments could be added.
Jessica Medrano (Unit 69) requested further details regarding the line items that were over budget and commented that with a current deficit was the Board doing the right thing by spending the amounts reported.
The Board noted that since the contract was signed three years before, the price of salt had increased dramatically. At the time of signing, the cost for an all-inclusive contract was much higher than the “a la carte” option (we pay for salt applications over and above the contract minimums, as needed) so the Board opted for the less expensive contract. The weather did not cooperate, which meant there were more salt applications than the contract provided for, so costs were much higher. In addition, Management commented that the vendor over salted (for liability concerns) and salted in areas that were not required. These matters were addressed with vendor.
Jessica Medrano (Unit 69) commented that the gate access to the church parking lot was being utilized by several Residents and she did not agree with the Board’s view of the survey taken and the decision to keep the gate access locked.
The Chair advised that a total of thirty-five residents participated in the survey. There were several residents near the gate who did not agree with keeping the gate access open; and others who want access restored. The Chair offered to place the item back onto the agenda for the next Board of Directors meeting for another review.
Branka Jovanov (Unit 68) noted that her unit was in direct access of the gate and commented about the amount of garbage being left in the laneway.
The Board agreed and took the comment under advisement to be addressed at a Board of Directors meeting.
Winsome Smith (Unit 40) commented that a simple lock with a code would solve the issue of accessing the gate be Residents only.
The Board requested that any comments and/or suggestions be submitted to Management which would then be forwarded to the Board. The previous survey results were displayed at the meeting and can be seen on the website (www.silvershadowpath.com).
Management advised that the additional work in front of Units 20 to 26 will require that residents park in the visitor parking while the concrete work along with the asphalt being laid were being completed
Rhonda Tsingos (Unit 74) thanked the Board and Management for all their efforts during a recent emergency that they had and were very pleased with the service received from Management.
Rhonda Tsingos (Unit 74) inquired whether comments and/or suggestions could be posted to the property website.
Tim Sly advised that the website page was not equipped to allow residents to post comments; however residents can email questions directly to him (tsly@ryerson.ca) and the questions along with an answer would be posted to the site.
Sheila Holmes (Unit 44) commented that the vendor had oversalted last year and commented that residents with pets had the option to place non-toxic product on their front porch to be used by the vendor however confirmed that had not happened last year.
The Board reported that the vendor had been instructed to not place the regular salt on the front steps and to only place on the walkways. Residents are responsible for using the provided ice melter (non-toxic to pets) on their own steps and porches.
9.0 ADJOURNMENT OF MEETING
There being no further business to conduct, the Chair asked for a motion to close the meeting.
On a MOTION by Sheila Holmes (Unit 44), seconded by Lara Malouf (Unit 58), it was resolved that the Annual General Meeting of Owners of York Condominium Corporation No. 110 be terminated at 8:56 p.m. as there was no further business to conduct. The motion was carried.
Appendix A
President’s Report
Thank you for attending the AGM. We are now in our third year of ZOOM AGM and whether it is your first AGM or 21st…. your first Zoom meeting or your 2,021st Zoom meeting – welcome.
It is my pleasure to be able to share a recap of the YCC 110 story for the past year, and to highlight some of the projects we accomplished.
This AGM covers the year beginning June 1, 2021, ending May 31, 2022. Because we have a mid-year fiscal year, it is sometimes hard to remember to talk about the previous year – but we are going to try.
You have already had a great review of the financial picture from our auditor, Brian Cerson. Thank you again Brian, for continuing to provide great guidance, timely financials, and always for refreshing our collective knowledge of balance sheets and income statements!
As a Board, we have several goals:
-
To balance the need for repair and maintenance around the complex
-
The requirement to build our Reserve Fund, so that we can maintain (and elevate) property value and ensure a safe and secure community
-
To use the operating budget (the expenses that we project such as hydro, landscaping and snow removal, water expense, property management fees, etc.) wisely
-
To use the Reserve Fund study document, (which is required under the Condominium Act) to determine the major repair and maintenance work that needs to be done around the complex. This becomes even more important in the post-COVID period of supply chain problems and escalating inflation.
The Engineering firm (Cion Colter) provides us with approximate costs and timing for the work over the next 30 years, but we must keep in mind that these numbers are projections; an estimate of how much it will cost and when it needs to be done. Some projects can be done sooner than expected some later, depending on the need. The Reserve Fund Study guides our actions.
Real Estate Update / Unit Sales June 2021 – May 2022
Totals were unavailable for this past year; suffice to say we had several sales and property values are high. We welcome any new owners to the AGM. Would you raise a hand to let us know who you are, and the unit you own? Thanks again for attending.
Accomplished this year:
Landscaping and winter preparation – from our supplier Everall Property Management.
-
Cutting the lawns, leaf pickup is underway, winter readiness is next on the list.
-
As in previous years, ice melter (It is expected to arrive by month end) will be delivered to each unit, and the salt bins will soon be positioned around the complex. They will be filled with road salt for use on sidewalks and driveways. All units will receive an email or paper copy of the ice melter instructions. Salt and ice melter will continue to put stress on our operating budget, so we are working at managing costs in the winter months ahead.
-
We continued the work on preserving the trees in the complex through Davey Tree – the large ash trees were injected, maintaining the canopy, trimming for safety where needed.
We had several trees die again last fiscal year on the boulevards in front of the units; the replacements are now planted, and we cannot encourage owners with trees on their property to water, water, water! It is the only way to preserve new trees.
Communication and other projects
-
Spring and winter newsletters sent out to owners (by Goldview)
-
Standard Unit Bylaw (SUB) flyers dropped off in owner mailboxes; we continue to gather votes (called proxies) for the SUB. We need two more owners to submit a proxy vote – then we will call a special meeting to pass the bylaw.
If you have not done so yet – or need more information, please contact any one of the Board members or Diane Zerafa. We will gladly share information, answer questions, and bring you a proxy form. -
Our visitor parking is monitored by EZPermit; and the number of available visitor spaces at any given time is much improved. We are pleased to announce today that we will change the time of day that owners need to call to register visitors from 7pm to midnight.
EZ permit parking is required if you have visitors parked between midnight and 7:00 a.m.
Signage around the complex will be updated as soon as the printer produces the stickers! -
For new owners – please remember to register with EZPermit for parking after midnight. Please contact the management office (Diane Zerafa or Raj Chatha to review the procedures and get the information you need).
-
We continue to ask that you and your guests follow the rules. It is really that simple. It makes life easier for all. Slow down. Guests in the parking lot; owners in their driveways. NO ONE parked on the road!! One way driving around the complex.
Planned work: Street facing caulking around doors, windows, garages; painting of hand railings, repair of eavestroughs (as needed).
These jobs were completed by our contractors during the spring of 2022, in the summertime.
Rogers Internet and Cable Contract: We signed a new contract with Rogers to provide cable television and internet services for all units. The cost for this service is $55/month/unit; the price is guaranteed for 5 years, and it is included in your monthly maintenance fee.
Cables and Wires – a never-ending story
This is a repeat item from last year – and the year before that. We do believe we are making progress in getting Rogers and Bell to deal with the cables they have rigged up throughout the neighbourhood. Depends on the day, frankly!
If you have cable issues (like outages) please follow our suggestions on the Silver Shadow Path website (www.silvershadowpath.com) – call Rogers or email them, keep a record, let the management office know you’ve been in touch. Only by pooling together our information on service issues can we make progress!
Access Gate Closed –
After surveying the community at large and interviewing the immediate neighbours of the access gate (between units 55 and 54); we decided to close the gate permanently. The gate was continually damaged, left open, locks destroyed, litter in the area, a gathering spot for teens, and so on. At the end of the day, the gate (originally the gate was installed to provide access to individuals renting parking from the church) became an expensive proposition. There was little consensus on what to do; so, it will remain closed. We are examining an alternate location, behind the shed at the western end of the complex. Stay tuned for further updates – you can check our website for news.
Go to www.silvershadowpath.com .
Emergency repairs
We deal with leaks, roof issues, fence breakages, tree pruning, nest removals, potholes, dips in the sidewalk, to name a few. Please contact Diane Zerafa if you have something that needs attention.
Updated Reserve Fund Study
Cion Coulter completed a new Reserve Fund Study; it was approved by the Board and circulated to all owners in the summer. They are forecasting the need to increase reserve fund contributions, given the impact of inflation and delayed R&M due to COVID. We will post the articles on the website if you would like to read them. We should be prepared to increase our annual fees to provide a secure future for our complex.
Silver Shadow Path Website
Created, designed, maintained by the ever-so talented Tim Sly!! It is a great resource and handy spot to find contact numbers and information. If you have a couple of spare hours… and a love of all things digital, Tim could use a hand! Please contact him to volunteer your services!
Thank You To Barb Scott, one of our Board members. Barb’s term has expired, and she is not running again, as she will be relocating to her “hometown” in New Zealand. It was Barb who planted and tended to the planters (at the east entrance) and the gardens in Angie’s Park. We are seeking a volunteer to replace Barb. Any green thumbs out there? We will buy the plants!
Finally – a big thank you to Diane and Raj, and the support team at Goldview, who have continued to provide coverage for us during the year. We are thankful to have you and the Goldview team working for us!
Stay safe and healthy, everyone. Thanks again for attending.
[PREVIOUS AGM MINUTES]
2021 ANNUAL
GENERAL MEETING
OF THE UNIT OWNERS of York Condominium Corporation No. 110, held on Tuesday, October 26, 2021 at 7:00 p.m. via video conference.
[Moved, seconded and accepted at 2022 AGM, Oct 25, 2022]
Representing the Board
Wendy Stewart President
Adam Capstick Vice President/Finance
Tim Sly Secretary
Howayda Tanious Director
Barb Scott Director
Guests
Brian Cerson Auditor, Brian T. Cerson, Chartered Professional Accountant
Diane Zerafa Condominium Manager, Goldview Property Management
Rebecca Pedoe Executive Administrator, Goldview Property Management
Katherine Norenius Recording Secretary, INaMINUTE Ltd.
1.0 CALL TO ORDER / INTRODUCTIONS
Rebecca Pedoe, of Goldview Property Management, introduced herself and advised Owners how to vote, make or second motions and ask questions.
Wendy Stewart, President of the Board, presided as Chair and welcomed the Owners to the Annual General Meeting (AGM) of York Condominium Corporation No. 110. The Chair introduced the Board of Directors, Property Management, the Auditor and the Recording Secretary and called the meeting to order at 7:08 p.m.
2.0 NOTICE OF MEETING AND CONFIRMATION OF QUORUM
The Chair confirmed that the Notice of Meeting, dated October 11, 2021, had been sent within the required 15 days to each registered Owner or Mortgagee, in accordance with the requirements of the Condominium Act, 1998 (the Act) and the By-Laws of the Corporation and advised that the Proof of Notice was on hand should anyone wish to view it.
There were 25 Units represented electronically in person, which satisfied the AGM quorum requirement of 25% of the Unit Owners represented in person or by proxy, in accordance with the Act. With a quorum present and proper notice having been given, the Chair stated that the Annual General Meeting was duly constituted to conduct business.
3.0 APPROVAL OF MINUTES OF THE ANNUAL GENERAL MEETING MINUTES –
NOVEMBER 12, 2019
The Chair stated that the minutes of the Annual General Meeting held on November 17, 2020 had been duly sent with the Notice to all Owners/Mortgagees of the Corporation and asked for errors and omissions to be brought forth from the floor. There being no corrections the Chair asked for a motion to adopt the minutes to record as presented.
On a MOTION by Emilie Lamy (Unit 9), seconded by Alan Conquergood (Unit 55), it was resolved to dispense with the reading of the minutes of the Annual General Meeting held on November 17, 2020 and to adopt the minutes to record, as presented.
The motion was carried.
4.0 AUDITOR’S REPORT
4.1 Presentation of Audited Financial Statements for the Period Ended May 31, 2020
The Chair announced that copies of the Auditor’s Report and the Audited Financial Statements had been sent to all Owners with the Notice of Meeting. The Chair asked Auditor Brian Cerson to review the Audited Financial Statements for the period ending May 31, 2021.
The Auditor advised that the audit report was clean, meaning Owners could rely on the accuracy of the financial statements as they fairly represented the financial activities of the Corporation for the year ended May 31, 2021.
The Auditor referred Owners to the Balance Sheet, noting assets in cash, investments, common element fees receivable and prepaid expenses, for a total of $503,000. After liabilities of $58,891 net assets totaled $444,000, approximately $64,000 higher than prior year, largely due to growth in the Reserve Fund.
The Statement of General Operations showed revenues of $495,000, of which approximately one (1) third was allocated to the Reserve Fund. Operating Expenses totaled $347,225, resulting in a deficit of $8,139 for the year. When added to the deficit balance at the start of the year, the Operating Fund balance had a deficit of $16,000 as of May 31, 2021. The Auditor noted that it would be unwise to continue to grow the deficit, so the Corporation would need to reduce expenses or increase maintenance fees.
The Reserve Fund balance, after allocations of $155,000 and expenditures of $89,000, was $460,000 as of May 31, 2021. The most recent Reserve Fund Study had been conducted in March 2020.
The Chair opened the floor to questions, and there being none, thanked the Auditor for his presentation.
5.0 APPOINTMENT OF AUDITORS
The Chair called for a motion to reappoint the Auditor for the fiscal year ending May 31, 2022.
On a MOTION by Tim Sly (Unit 8), seconded by Barb Scott (Unit 15), it was resolved that in accordance with Section 62(b) of the Condominium Act, 1998, the firm of Brian T. Cerson, Chartered Professional Accountant be appointed Auditor of the Corporation, to hold office until the close of the next Annual General Meeting of the Owners, or until their successors are appointed at a remuneration to be fixed by the Board and that the Board is hereby authorized to fix such remuneration at a duly called meeting of the Board.
The motion was carried.
7.0 BOARD’S REPORT
W. Stewart presented the President’s Report, providing an overview of accomplishments and challenges during the June 1, 2020 through May 31, 2021 fiscal year. The President’s report is appended to these minutes.
8.0 NOMINATION / ELECTION OF TWO (2) DIRECTORS
81 Explanation of Election Procedures
Adam Capstick took over as Chair for the election portion of the meeting, and announced that there were two (2) positions available for election, each for a term of three (3) years. The election was for Directors and the new Board would decide upon the positions each Director would hold.
8.2 Nomination of Candidates
The Chair informed attendees that, prior to delivery of the Notice of Meeting, the following candidates had informed the Corporation of their intent to stand for election and had proven eligibility:
-
Timothy Sly (Unit 8)
-
Wendy Stewart (Unit 48)
The Chair proceeded to call for nominations from the floor three (3) times, and there being none, asked for a motion to close the nominations
On a MOTION by Nancy Barnes (Unit 24), seconded by Jim Scott (Unit 15), it was resolved that the nominations from the floor be closed.
The motion was carried.
8.3 Election Results
The Chair invited each candidate to make a brief presentation.
The Chair stated that:
Timothy Sly (Unit 8) was duly elected, by acclamation, as Director of the Corporation.
Wendy Stewart (Unit 48) was duly elected, by acclamation, as Director of the Corporation.
W. Stewart resumed as Chair.
9.0 OTHER BUSINESS
The Chair opened the floor for questions.
Vesna Spasojevic (Unit 57) asked for clarification regarding closing the gate to the church parking. The Owner asked why the gate was being closed as it was not a gated community and it provided convenient access for deliveries and for children going to school.
The Chair advised there had been a variety of issues with the gate, which had initially been opened for people who were paying for parking at the church. The gate had been vandalized and had to be repaired repeatedly so the Board finally decided just to close it up. The Board was willing to have another look at it, but it was an expense to the Corporation, and therefore the Owners.
Nancy Barnes (Unit 24) noted that the hand railings had been painted on most units but there was a tall, trellis-like rail that had not been painted and Raj had advised the Owner that it would be the Owner’s responsibility to paint it. The Owner asked if she could have a list of which items were the Owners’ responsibility.
Management advised that they had not been included in the scope of work but she would have a look when she was on site October 27, 2021, as they would need to be stripped and repainted.
Jessica Medrano (Unit 69) inquired who made decisions, such as the decision to close the gate and parking control, and who decided whether to incur expenses. The gate closure was inconvenient and spending money on parking control during a pandemic did not make sense. The Owner further asked if Owners had any input.
The Chair advised that the Board made those decisions. Issues arose and were brought forward, such as when concerns were brought to Management by Owners. The Board investigated issues and spoke to Owners before making decisions. The parking decision had taken several months and the Board investigated what was being done at other complexes, looked at the number of complaints that were being received and investigated options for parking control. The Board then discussed the issue and made a decision, which was minuted. If there was something in particular an Owner wanted input on they should bring their concern to the Board and they could ask to be invited to a Board meeting to have their say on an issue. The Board always obtained three (3) quotes and made decisions based on what they thought the budget could handle. The Board reviewed the financial statements and discussed various projects at the monthly Board meetings.
Jessica Medrano indicated she had never been approached by Board members, though sometimes she did get flyers.
The Chair clarified that items particular to individuals was not communicated to Owners. She spoke to her neighbours and the other Board members spoke to various Owners. As an example, the Board did a survey regarding the Rogers contract and communicated the results to everyone. The Board did more research and made a decision based on the results of the survey. As Directors they could not ask Management for an Owner’s phone number or email address.
Jessica Medrano stated that she had seen a number of rats on the property and was concerned that more money was being spent on parking control than on pest control. She had contacted Management but had not received a response.
The Chair noted that pest control was actively monitoring bait stations for the past three (3) or four (4) months. With regards to Management’s response, D. Zerafa and Raj tried to respond quickly but the best way to contact them was through email.
Management requested that the Owner resend the email about the rats because Management did not see it.
Vesna Spasojevic (Unit 57) stated she saw children jumping over the fence and she noticed the new contractors came and closed the gate, then opened the gate the next day. The Owner asked what it cost to close the gate.
Management advised that the gate was removed and was fenced off.
The Chair added that children had always jumped the fence.
Management added that they had contacted the principal of the school, who denied the damage to the gate was caused by the school children and asked that Management send photographs as proof. Management asked that if any Owners had pictures of children jumping the gate to send them to Management. The cost of the fence was not known as the bill had not yet been received.
Bernadette Surman (Unit 37) noted there were more rats because of the sewer replacements going on nearby.
David Burrell (Unit 78) thanked Management and the Board for the work they did and offered two (2) observations. First, runoff from the eavestrough on Unit 78, the end unit, was eroding the hill beside his Unit leading to the shared pathway. A concrete slab had been placed under it but water was still getting underneath.
Management noted that it was observed during a walkthrough with the roofer the prior week and the roofer would be looking at it.
David Burrell noted that water seemed to be a big part of the maintenance fee, particularly since people were at home more during the pandemic. The condominium corporation the Owner lived at previously had a plumber go into the units to check for water waste like leaking toilets. The potential savings could be worth the upfront cost.
The Chair noted that it was probably time to do that again, though communications had been sent to Residents about checking for water loss. A study had been done previously. With everyone at home, that was a big reason for higher consumption and the Board would have to budget for it. The supplier had come in to look at metering everyone’s unit individually but it could not be done because of the units’ plumbing. The Board would add it to their agenda.
T. Sly added that the units used to have old fashioned air conditioning units which ran water all the time and there might be a few of those units left. When paying for water as a collective, people tended not to conserve as much. The Board would keep an eye on it as the pandemic resolved.
Danica Rajic (Unit 30) stated that she thought the $7,000 overdraft was unnecessary and it would be good not to have it happen in the future. The Owner inquired if it was the Board’s responsibility or Management’s.
Management explained it sometimes happened. There had been a couple of items that they thought were going into the next fiscal year but did not. They would try not to have it happen again going forward.
A. Capstick added that every budget was an approximation and the Board tried hard to keep fees low. The easiest way to eliminate overdrafts was to increase fees, but the Board tried not to do that and tried not to waste money. An operating deficit of $16,000 over two (2) years of a pandemic was not too bad and there had not been a special assessment in 50 years. When running a deficit, the only way to get out of it was to increase fees.
The Auditor added that most condominiums operated on a break even target each year, which was sometimes easier said than done, as things could change, such as the large insurance increase and grass seeding twice in one (1) fiscal year. The simplest solution was to raise fees and the second part was to watch costs, such as determining if it was necessary to seed the grass the next year. As costs inflated, it was necessary to take a two (2) pronged approach, a modest increase in fees and keeping a close eye on expenditures.
Milos Orlic (Unit 42) asked about the process to renew with Rogers for the next year. The Owner noted he was new and wanted to know if the Corporation was going to vote to stay in the contract and if he could opt out of the contract. Everyone’s needs were different and the Owner had not had cable in five (5) years and thought it was a waste.
The Chair advised there were three (3) choices: Bell, Rogers or neither. The Board had asked people for their opinion and a number of people did not want cable and were interested in other options. The cable companies would not let people pick and choose so everyone would have to use their phone, cable and internet. The Corporation had signed a deal with Rogers but needed to rethink it and look at other options. Because it was part of the monthly fees, it was not clear if the Board had the authority to remove it, so the Board would start to research the issue early.
T. Sly added that more and more people were disconnecting from cable and in the last survey about 1/3 wanted to drop it.
Howayda Tanious (Unit 7) noted the deficiency in the budget, the expenditures for the year such as water and sewer, and people working from home were all unexpected. Insurance had increased dramatically and the Board had been working hard trying to get a standard unit by-law signed off to manage insurance costs. The Director encouraged everyone to look at the amount of money spent on insurance, noting that with claims over the last two (2) years more increases were expected. It was necessary to sign off on the standard unit by-law to contain costs. As well, the Director noted that she saw people driving against traffic to park, mostly Residents, and asked everyone to respect the rules and drive in the right direction. It was very dangerous, especially for children who did not expect cars to come from the other direction.
The Chair added that it was a big concern that people were not respecting the one (1) way sign.
10.0 ADJOURNMENT OF MEETING
There being no further business to conduct, the Chair asked for a motion to close the meeting.
On a MOTION by Alan Conquergood (Unit 55), seconded by Lara Maalouf (Unit 58), it was resolved that the Annual General Meeting of Owners of York Condominium Corporation No. 110 be terminated at 9:02 p.m. as there was no further business to conduct.
The motion was carried.
APPENDIX A
PRESIDENT’S REPORT
Thank you for attending the AGM – our second ZOOM AGM! Do I detect a trend here? Seems life has become somewhat different for most of us since COVID19 arrived. Whether it is your first AGM or 21st…. your first Zoom meeting or 2021st Zoom meeting – welcome.
It’s my pleasure to be able to share a recap of the YCC 110 story for the past year, and to highlight some of the projects we accomplished.
This AGM is focused on the year beginning June 1, 2020, ending May 31, 2021. Because we have a mid-year fiscal year, it is sometimes hard to focus on the previous year – but we are going to try.
You already have had a great review of the financial picture from our auditor, Brian Cerson. Thank you again Brian, for continuing to provide great guidance, timely financials, and always for refreshing our collective knowledge of balance sheets and income statements and so on.
This is the third year running we have tried, as a board, to balance the need for repair and maintenance with the need to build our Reserve Fund, so that we can maintain (and elevate) property value and ensure a safe and secure community. We are guided by our operating budget (the expenses that we project such as hydro, landscaping and snow removal, water expense, property management fees and so on) and our Reserve Fund study document, which is required by law. We use the Reserve Fund study to determine the major repair and maintenance work that needs to be done around the complex. Because the approximate cost and timing for the work is a projection – an estimate of how much and when - some projects can be done sooner than expected, some later, depending on need. It guides our actions.
Once again, some of our planed work was rescheduled or deferred. We are still seeing construction materials and availability (e.g., lumber, metal work, and contractors) in short supply due to COVID. And as you know, prices for some commodities, like lumber, have doubled or tripled, so we are cautious at times about what we spend.
Your Board considers that all of us – be you a homeowner, tenant, paid employee, service provider, or volunteer – will try to protect our investment in our homes. We also want to protect the health of that same team of individuals, so maintaining COVID protocols is essential, and we will continue to do so.
Real Estate Update / Unit Sales June 2020 – May 2021
Mark Howarth and his mom Luann Howarth (both with Royal Lepage) circulate a newsletter regularly on happenings in the area. Mark and Luann are owners at Silver Shadow Path; Mark was on the Board for a term. I asked Mark to provide some sales data for the meeting, and he was happy to help.
Three units sold at Silver Shadow Path during the period we are talking about, with an average price of $811,889 (low price was $747,777; high was $876,000). Normally, we “lead the pack” of comparable townhouse/condos in the area (Old Burnhamthorpe, Rathburn & Mill, Centennial Park, Renforth and Rathburn).
However, prices and sales have been volatile this past year, and in Mark’s opinion, panic buying (people are scrambling to get a place they can afford) and a lack of listings is making the market uncertain and unpredictable. At Centennial Park, for example, there was a gap of $80,000 between the top sale in their complex and the next highest. And at The East Mall, there’s a spread of $255,000 between two sales. That kind of gap is unprecedented and because of that kind of activity, it is hard to know what to expect when fear is driving the sales process. We shall see how things proceed – we’ve had a couple of units sell in the last three months and another is up for sale now. The price of our units seems to be steadily rising – more so when renovations have been done. We are coming up to a 50-year anniversary soon – we believe the complex was incorporated as a Condominium in 1973, which would mean 2023 as a 50th birthday. More on that as we get closer.
From a monthly maintenance fee perspective, we continue to be competitive:
Centennial Park - $658; Renforth – $450; East Mall - $501 Silver Shadow Path - $476; Old Burnhamthorpe- $593; Rathburn & Mill - $461
One of the great things about this complex are the “resources” within. We have access to expertise –so our real estate expertise is deep! We rely on another former Board member, Lucky Millidrag and his family to help us maintain the “sell-ability” of the complex.
Accomplished this year:
Landscaping and winter preparation – from our supplier Everall Property Management.
-
Cutting the lawns, leaf pickup is underway, winter readiness is next on the list.
-
As in previous years, ice melter (It is expected to arrive by month end) will be delivered to each unit, and the salt bins will soon be positioned around the complex. They will be filled with road salt for use on sidewalks and driveways. All units will receive an email or paper copy of the ice melter instructions.
-
We continue to work on preserving the trees in the complex through Davey Tree – inject the ash trees, maintaining the canopy, trimming for safety where needed. We have had several trees die (quite suddenly) this year and they have either been removed and replaced, or are in process,
Communication and other projects
-
Spring and winter newsletters were circulated
-
Standard Unit Bylaw (SUB) flyers were circulated, and we continue to gather votes (called proxies) for the SUB. We need 4 more owners to submit a proxy vote – then we will call a special meeting to pass the bylaw.
If you haven’t done so yet – or need more information, please contact any one of the Board members or Diane Zerafa. We will gladly share information, answer questions, bring you a proxy form… -
Our visitor parking is being monitored by EZPermit and we seem to have a better handle on managing available space for visitors.
For new owners and those who may not have had visitors (it’s been a long haul with COVID!), remember to register with EZPermit for parking after 7 pm. Please contact the management office (Diane Zerafa or Raj Chatha to review the procedures and get the information you need. -
We continue to ask you and your guests follow the rules. It’s really that simple. It makes life easier for all. Slow down. Guests in the parking lot; owners in their driveways. NO ONE on the road!!
Planned work: Street facing caulking around doors, windows, garages; painting of hand railings, repair of concrete steps, concrete pads as needed.
This work has been planned for some time; was tendered in the winter of 2021 and we selected Ontario Roofing to do the work, which was completed this past summer (so it’s in next year’s plan, given our calendar.) The metal railings in the backyards of units with balconies are not in good shape; however, it is cost-prohibitive to scrape, sand, prime and repaint them. We will go back to the drawing board and see what we can afford to do next summer.
Cables and Wires – an ongoing saga
This is a repeat item from last year - we are making some progress in getting Rogers and Bell to deal with the cables they have rigged up throughout the neighbourhood. They are not easy companies to deal with, and COVID didn’t make it any easier. I had hoped not to have to hear about those cables again, but here we are!! If you have cable issues (like outages) please follow our suggestions on the Silver Shadow Path website (www.silvershadowpath.com) – call them or email them, keep a record, let the management office know you’ve been in touch. Only by pooling together our information on service issues can we make progress!
The Rogers contract expires August 2022 so we will begin discussion with the community about what options are available to us.
Emergency repairs
We deal with leaks, roof issues, fence breakages, tree pruning, nest removals, and so on. Please contact Diane Zerafa if you have something that needs attention.
Updated Reserve Fund Study
Cion Coulter completed the study, and it was approved by the Board in April 2020. The study takes place every 4 years and guides our expenditure of reserve funds, as well as helps us determine how much money the reserve fund will need to be fully funded for the work at hand (this is in part how the monthly maintenance fees are determined).
Silver Shadow Path Website
Created, designed, maintained by the ever-so talented Tim Sly!! It’s a great resource and handy spot to find contact numbers and information.
Passages
We have had several ‘departures’ this year – long-time owners moving, new neighbours arriving and settling in, and some deaths. Angie Fiorentino was one of our owners who passed away last January. You can read about her on the website, and visit the tree planted in the parkette (between #48 and #49).
Thank You
To Barb Scott, who plants and tends to the planters (at the east entrance) and the gardens in Angie’s Park. They look great! And a special note of thanks to Mr. Anton Volek at Unit 49 for the use of his hose to keep Angie's Park trellis & planter boxes thriving through the hot summer months. Many thanks.
To Tim Sly for the website work; for enabling our monthly Board meetings on Zoom, for being a staunch advocate for all things Silver Shadow
Finally – a big thank you to Diane and Raj, and the support team at Goldview, who have continued to provide coverage for us during the year, maintaining COVID protocols while balancing our needs. We are thankful to have you and the Goldview team working for us!
Stay safe and healthy, one and all. Thanks again for attending.